State energy master planning and long-range electric and gas system planning proceeding
Read Online
Share

State energy master planning and long-range electric and gas system planning proceeding opinion and order by New York (State). Energy Planning Board.

  • 280 Want to read
  • ·
  • 30 Currently reading

Published by The Board in [Albany, N.Y.] .
Written in English

Subjects:

Places:

  • New York (State)

Subjects:

  • Energy policy -- New York (State),
  • Electric utilities -- Government policy -- New York (State),
  • Gas industry -- Government policy -- New York (State)

Book details:

Edition Notes

StatementState of New York, Energy Planning Board.
Classifications
LC ClassificationsHD9502.U53 N5243 1980
The Physical Object
Pagination176, [44] p. ;
Number of Pages176
ID Numbers
Open LibraryOL3924916M
LC Control Number81622620

Download State energy master planning and long-range electric and gas system planning proceeding

PDF EPUB FB2 MOBI RTF

Planning Methodology –The Start • Follow Architectural Master Plan –“Living” Document • Determine Goals and Expectations –Level of Detail –Time Window –Biases/Political issues Federal Utility Partnership Working Group May , Cincinnati, OH Ensure Energy Systems Meet Mission Needs and Addresses Deferred Maintenance. An update of the original State energy master plan and long-range electric and gas report. Description: 3 volumes: graphs ; 29 cm: Contents: V Draft report --v. 2. Background and supporting analysis--v Draft environmental impact statement. Other Titles: State energy master plan and long-range electric and gas report. Responsibility. In , NASEO released "NASEO's State Energy Planning Guideline: Guidance for States in Developing Comprehensive Energy Plans and Policy Recommendations. " The Guidelines build upon an earlier version of the report, as well as research from that established a baseline of energy planning processes, plan elements, and market implications. 29,, kWh of electricity from the local utility, genera, kWh of electricity and consumed 6,, therms of natural gas. In a given year, the amount of electricity and natural gas purchased and used by Turning Stone could light over , homes and heat over 7, homes in New York State.

The primary components of this plan are energy conservation, infrastructure improvement, energy procurement, funding, and energy management. Though each area has individually defined problem, objective, and action statements, this plan has a common focus: “To reduce energy consumption and procurement costs, creating utility savings to be. GHG emissions for natural gas and electricity are roughly proportional to their usage, as shown indata set 3 It should be noted that New York State has a relatively low GHG emissions electricity production grid at lbs CO2e / MWh compared to the USA national average of lbs CO2e / MWh (based on eGRID ). With increased energy planning needs and new regulations, environmental agencies, state energy offices and others have expressed more of an interest in electric power sector models, both for (a) interpreting the results and potential applications of modeling from other groups, and (b). A proper model for future energy system planning should enable energy storage allocation at all locations within a network, including transmission, distribution, and demand side. One possible way of modeling such a multiscale planning problem (from supplier to user) is a two-stage framework (see Fig. 15).At the first stage, individual and aggregated electricity generation and a load of the.

Next, your master plan and vision for your campus is reviewed in depth, to understand where your campus will be in 5, 10, 20 years and beyond to calculate system(s) projections and needs. Here we will ask about your specific goals for each system, since there are differing levels of redundancy, sustainability, and efficiency that can be. Pacific Gas & Electric Company (PG&E) This business plan outlines Pacific Gas and Electric Company's (PG&E's) high-level approach to achieving state energy .   National Grid Electric and Gas System Level Plan. 3. 1. Introduction. National Grid (the Company) has established the System Level Plan (SLP) for the purpose of managing outages caused by storms and other natural disasters, civil unrest, major equipment failure, or other events that cannot be managed exclusively by the Emergency Response. Northeast Coordinated Electric System Plan. Public Policy Planning Reports. Reliability-Needs-Assessment. As New York State advances climate and energy policies in pursuit of a cleaner, more resilient grid, we continue to examine long-range scenarios to assess impacts on grid reliability.